How to Take Measurements — or Check Your Surveyor's Work

What to measure before ordering a kitchen: walls, recesses, pipes, sockets, ventilation. How to verify a surveyor's plan and what it must include.

When to take measurements

Final measurements should only be taken after all rough work is complete: walls plastered, floor screed laid, windows and radiators installed. Measuring against the old kitchen or bare unplastered walls introduces errors that surface during installation.

What to measure

  • Length of each wall — at floor level, mid-height, and near the ceiling (walls are rarely perfectly parallel)
  • Floor-to-ceiling height — at several points along the wall
  • Recesses and projections: width, depth, height from floor
  • Window and door openings: distance from the corner to the opening, reveal width
  • Radiator: distance from the corner, width, depth, height from floor to bottom edge
  • Pipes: all hot, cold water and waste outlets with distances from two walls and from the floor
  • Gas riser or cooker point (if present): exact position
  • Ventilation duct: dimensions and position in space

Electrical points to record

  • Position of all sockets: distance from the corner and from the floor
  • Light switches: make sure none end up behind a cabinet door
  • Extractor outlet position: ducted extraction needs a route to the vent or outside
  • Dedicated outlets for oven, dishwasher, fridge — 230 V needed near each appliance

How to measure correctly

  • A laser measure is more accurate than a tape, especially over 2 m
  • Take every measurement twice — a discrepancy over 3 mm needs re-checking
  • Check the floor level: place a spirit level along the full length of the kitchen wall
  • Floor variation: measure at the start and end of the run. More than 10 mm — tell the manufacturer before ordering

What the surveyor's plan must show

  • All wall dimensions with openings, recesses, and projections marked
  • Pipe positions referenced from two walls (not just one)
  • Socket positions with height from floor
  • Ceiling height at several points
  • Floor variation (if any)
  • North arrow or window orientation — to understand natural light direction

Ask the surveyor to show you the plan before they leave. If it shows only one wall length with no pipes, sockets, or floor variation — the survey is incomplete. The manufacturer will build to whatever they were given.

Common surveyor mistakes

  • Floor variation not recorded — base units install with a gap underneath or won't fit at all
  • Waste pipe under the sink not noted — it obstructs the drawer or cabinet door
  • Window reveal depth ignored — a wall unit hits the reveal
  • Measured against the old kitchen — after removal the wall turns out to be different
  • Ventilation duct forgotten — the extractor won't fit where it was planned

If you're measuring yourself

  • Sketch the room outline on paper first, then add all the details
  • Write each dimension directly on the sketch as you go — "pipes: 340 mm from left corner, 120 mm from floor"
  • Photograph the wall with the tape measure next to each feature — photos resolve disputes later
  • Send both the sketch and photos to your designer together

You can put the sketch straight into the floor plan editor: walls with thickness, openings, and on each wall's elevation — pipes, outlets and ventilation with distances from the corner and the floor. The kitchen itself is then built on that plan.

Ready to design your kitchen?

Build your project in the planner: 3D, exact measurements, and a parts list ready to order.

Design for free